Meeting up with Victor and Greg in Ocean Terminal, Edinburgh |
Next to the Royal Yacht Britannia |
That's the cruise ship Victor and Greg were on |
The roof we have to build. First few trusses in position, we work to the right |
The work to be done - that's a long way (100 feet or 32 meters) |
Jackie (left), Brian (centre) and Tony (right) guiding a truss into position |
Tuesday a slightly gentle start, till the delivery arrived, as next up was a quad.
The roof grows - day 3 (possibly) |
The big JCB lifting beast with some trusses to lift |
The roof growing more - day 4 |
Some cat relief. Gummy and Ghengis cats in bed with us one morning |
A break from building, watering in the polytunnel |
A great sunset on a country walk 2 minutes walk from their house |
Back to work and here's Jackie throwing a rope over the new lintel |
The Team (minus Brian) Nicky up the ladder on the left, Frank, Tony, Ian, Jackie and Helen |
Helen screwing on sarking to make a truss safe |
Brian high up in the rafters |
A short video showing one of the final trussess being fitted
Yeah! It's finished, time for a beer and cake! |
Bye Tony and Nicky, it's been fabulous as usual, see you next year. We'll drag our tired, aching bodies away! |
1 comment:
Fabulous! We loved it too. H, I and M-D xxxx
Post a Comment